Profit First for Concrete Contractors
How concrete contractors can run Profit First: allocate from real revenue, park ready-mix and pump money, and fill a winter reserve while the pours are on.
Profit First works for concrete contractors when you apply it to real revenue, not to every dollar that hits the bank. A big share of each deposit belongs to the ready-mix plant, the rebar supplier and the pump service, so that money gets parked first. The rest is split into profit, owner’s pay, taxes and operating expenses, and for a concrete company one more piece: a winter reserve funded while the trucks are still rolling.
What is Profit First, and why concrete needs the contractor version?
Profit First is a cash management system created by Mike Michalowicz in his book Profit First. Each deposit gets split by set percentages into separate bank accounts, so profit, your pay and your taxes are taken out first instead of hoped for at the end. Shawn Van Dyke’s Profit First for Contractors adapts it for construction around real revenue:
Real revenue = total revenue − materials − subcontractors
That adjustment matters more in concrete than in most trades. A yard of concrete is expensive before anyone touches it, and you’re buying rebar, form materials, base gravel and mix upgrades on top of it. If you run your profit percentage on the whole deposit, you’re “taking profit” out of money you owe the plant. The Profit First for contractors guide walks through the full set of accounts; this article covers what’s different when you pour concrete for a living.
How to calculate real revenue for a concrete company
Real revenue is what’s left of your sales after the pass-through costs: materials and subs. For a concrete contractor, the usual line looks like this:
- Materials: ready-mix by the yard (including short-load, wait-time and after-hours charges), mix upgrades like accelerators, retarders and fiber, rebar and mesh, form lumber, base, vapor barrier, curing compound and sealers.
- Subcontractors: hired pump service with an operator, saw cutting, hauling and excavation you sub out, and any crews you pay on a 1099.
- What stays in real revenue: your own crew’s labor and burden, your trucks, your owned equipment, your overhead and your profit.
Say a concrete contractor does $2,000,000 a year. Materials run $700,000 and subs (pump service, saw cutting, hauling) run $200,000. Real revenue is $1,100,000. That $1.1 million is the business you actually run; the other $900,000 passes through you.
Where ready-mix and pump costs go
The pass-through share of each deposit goes to a Materials & Subs account before anything else is allocated. Many contractors add this account to the core Profit First setup because supplier bills don’t wait for allocation day.
Concrete makes this account work hard. You pay the plant and the pump within days or weeks of the pour, and you may wait a month or two for the GC. Mix costs move too. A hot-weather retarder, a cold-weather accelerator or a short-load charge on a small pour all land on the bill after the bid was written. Sizing this account from your actual supplier terms, not from the bid, keeps a surprise ready-mix statement from draining payroll money.
If you own your pump, its payment, fuel and maintenance come out of Operating Expenses instead, and the pump’s earnings stay in your real revenue.
How to size a winter reserve
Your winter reserve should cover your fixed costs for the slow months, minus whatever work you realistically do in them. Start with what the business spends each month when nobody is pouring: office staff, insurance, truck and equipment payments, rent, the core crew you keep on, and your own pay.
Here’s a worked example in round numbers. Say the business above has fixed costs of $45,000 a month, including the owner’s pay. December through February is slow, and the company still bills about $15,000 of real revenue a month from small jobs and snow-season repairs.
| Per slow month | Three slow months | |
|---|---|---|
| Fixed costs, including owner’s pay | $45,000 | $135,000 |
| Real revenue still coming in | −$15,000 | −$45,000 |
| Reserve needed | $30,000 | $90,000 |
That $90,000 has to be set aside during the other nine months. Across roughly $1,055,000 of in-season real revenue, it works out to about 8.5% of every in-season deposit’s real revenue going to the reserve. Many contractors keep that reserve at a second bank, so a midsummer equipment purchase doesn’t quietly spend it. The seasonal cash flow article goes deeper on sizing it and on managing crew in the off season.
A worked example: one peak-season deposit
Here’s how a single June deposit might move. Say a GC pays a $200,000 draw on a commercial slab job, and materials and subs on that job ran 45% of the contract.
The percentages below are illustrative for this example only. They are not a recommendation for your business, and they are not the book’s tables. We set real targets from each company’s own numbers.
| Account | Example % | Amount |
|---|---|---|
| Materials & Subs (45% of the deposit) | — | $90,000 |
| Real revenue | $110,000 | |
| Profit | 5% of real revenue | $5,500 |
| Owner’s Comp | 10% of real revenue | $11,000 |
| Tax | 5% of real revenue | $5,500 |
| Winter reserve | 8.5% of real revenue | $9,350 |
| Operating Expenses | the remainder, 71.5% | $78,650 |
Operating Expenses pays the crew, burden, fuel, insurance and equipment. If $78,650 can’t carry two weeks of operations in peak season, that’s useful information: either the job is priced too thin or your overhead is too heavy for your volume. The overhead calculator shows how much overhead every job has to carry.
When to allocate on a concrete job
Allocate twice a month, on the 10th and the 25th, from whatever landed since the last allocation day. Concrete jobs get paid in three common ways, and each one fits that rhythm differently:
- Residential deposits for driveways, patios and decorative work: allocate the deposit when it lands, but keep the materials share parked until the pour.
- Progress draws on commercial work: allocate each draw as it’s paid, using that job’s materials-and-subs share.
- Retainage: allocate it when the check actually clears, not when you bill it. Until then, it’s money in someone else’s account. Our article on retainage accounting covers how to track it.
Common mistakes
Running percentages on total deposits. It overstates what you can set aside and leaves the plant bill short.
Using one materials share for every job. A stamped patio and a commercial slab carry very different material shares. Use the job’s own share, or a type-of-work average from your job costs.
Funding the winter reserve only in a great month. The reserve works because it’s funded from every deposit, not from what’s left over in October.
Forgetting pump and mix upgrades in the bid. If pump time and hot-weather additives aren’t in the estimate, Profit First will show it, because Operating Expenses runs dry first.
Treating the reserve as profit. The reserve pays winter bills. Profit is separate, and it’s distributed on its own schedule.
Where this breaks down
Profit First moves cash; it doesn’t fix pricing. If your price per yard doesn’t cover concrete, labor, pump time and overhead, the allocations will show the shortfall but can’t close it. That takes job costing by the yard and the square foot, so you know which kinds of work actually pay.
It also depends on real numbers. If ready-mix tickets aren’t coded to the right job, your materials share is a guess, and so is real revenue. A Certified Profit First Professional sets the percentages from your books, and the books have to be right first.
Frequently asked questions
Does Profit First work for a seasonal concrete company?
Yes, and seasonal businesses arguably need it most. The system forces you to set money aside from every deposit during the pouring season, which is exactly what keeps payroll and overhead covered when the ground freezes. The key is adding a winter reserve sized from your own slow months.
Is a pump truck a material, a sub or my own cost?
If you hire a pump service that brings its own operator, most contractors treat it like a subcontractor, so it comes out of real revenue. If you own the pump, it's your equipment and its cost stays inside real revenue. Pick one treatment and use it every month so your numbers stay comparable.
What if ready-mix prices go up after I bid the job?
Your Materials & Subs account pays the higher bill, and your margin absorbs it unless the contract lets you pass it on. Watch the gap between bid and actual cost per yard every month, and update your price per yard before the next round of bids instead of at year end.
How do retainage and slow GC payments fit in?
Retainage is real revenue you've earned but haven't been paid. Allocate it when it actually lands in the bank, not when you bill it. Until then, it's a reason to keep a little more in Operating Expenses during big commercial jobs.
Keep reading
- GuideProfit First for Contractors: The Complete GuideHow Profit First works for construction companies: real revenue, the bank accounts, 10th and 25th allocations, and a worked example with real numbers.
- ServiceProfit First advisoryPay yourself, set aside taxes and keep profit — every month.
- IndustryAccounting & Bookkeeping for Concrete ContractorsJob costing by the yard and the square foot, pour-day labor, pump time and retainage, tracked by a back office that works with concrete contractors.
- ArticleSeasonal Cash Flow for Contractors: How to Get Through the Slow MonthsHow contractors handle winter slowdowns: build reserves in season, manage fixed costs and crew, use credit carefully and book spring work early.
- Free toolOverhead percentage calculatorThe overhead every job has to cover, as a % and per labor hour.