Labor decides whether an electrical job makes money, and it hides well. Rough-in looks fine, trim runs long, and the retainage you’re waiting on turns out to be the profit you thought you had. We track hours, wire and gear by phase so you see it coming while there’s still time to fix it.

Monthly revenue chart and expense breakdown, books ready for tax season

Sound familiar?

Built for electrical contractors.

Commercial and industrial projects, residential new construction, service work and public jobs

  • “Every job looks good at rough-in and then trim eats the profit.”
  • “Copper jumped between bid day and the day we bought the wire, and I ate the difference.”
  • “The GC is still holding retainage on jobs we finished last year.”
  • “I bid it with apprentices and ended up sending journeymen.”
  • “We run a lot of service calls and I can’t tell if they make money or just keep the guys busy.”

Job costing, your way

What we track on every electrical job

01

Material costs on every job

Electrical materials move with copper prices and lead times, so we track them by job and phase as they’re bought.

  • Wire and cable by job, with copper price changes since bid day
  • Conduit, fittings, strut and hangers by phase
  • Boxes, devices, plates and breakers
  • Panels, switchgear and transformers, with long lead times and deposits tracked
  • Fixtures: contractor-supplied, owner-supplied or carried as an allowance
  • Leftover wire and stock returned to the shop or credited back
02

True labor costs

Labor is the biggest cost on most electrical jobs, and the crew mix sets what an hour really costs.

  • Labor units in the estimate vs. actual hours worked
  • Journeyman, apprentice and foreman mix on each job
  • Hours by phase: underground, rough-in, trim, gear, low voltage
  • Labor burden: payroll taxes, workers’ comp, benefits and fringes where they apply
  • Prevailing wage and certified payroll on public work
  • Overtime to make inspection dates and the GC’s schedule
03

Hidden project costs

Electrical jobs pick up costs that never show up on the takeoff.

  • Lifts, trenchers and other equipment rental
  • Temporary power and site lighting
  • Permits, inspections and reinspections
  • Return trips for trim-out, punch lists and energizing
  • Small tools and consumables burned through on long jobs
  • Bonds and insurance required on commercial and public work
04

Margins & markup — bid vs. actual

We compare estimated to actual hours and materials by phase while the job is open, not after closeout.

  • Labor hours: estimated vs. actual by phase
  • Material cost vs. the takeoff, by job
  • Monthly WIP schedule with over/under billing
  • Projected profit at completion on every open job
  • Service margin kept separate from project margin
05

Cash timing

On commercial work you carry payroll for weeks before a pay app turns into a check, and retainage stays out longer still.

  • Pay applications against the schedule of values, submitted on time
  • Retainage receivable by job, followed up after substantial completion
  • Gear deposits and material buys ahead of billing
  • Service invoices collected on the spot vs. sitting in receivables
  • Payroll covered from Profit First accounts, not the next draw
06

Change orders & scope creep

Commercial electrical jobs change constantly, and pending work done without approval is where the profit goes.

  • Added circuits and relocated devices logged as they happen
  • Design changes from the engineer or GC priced and submitted
  • Pending vs. approved change orders on the WIP schedule
  • Change order hours tracked apart from base contract hours
  • Rework on owner-supplied fixtures billed back

Know your target

What margin should electrical contractors aim for?

Commercial electrical is bid, carries heavy material (wire, gear) and labor cost, and usually sits under a GC with retainage. Service work, priced by the call, earns well above project margins — we benchmark yours from your own jobs.

A 20% gross margin means pricing at about a 25% markup over your job costs, not 20%. Check a job →

Typical gross margin

Commercial & project work20–30%

Net profit after overhead: 5–8% (before income tax)

Public-company filings and industry data

Gross margin = revenue minus direct job costs (materials, field labor with burden, subs, job equipment). How you classify labor and equipment can move it by several points — your own job costs are the number that counts.

Your monthly numbers

What you’ll see every month

  • Labor hours: estimated vs. actual by phaseShows which phase is running over while you can still change the crew.
  • Projected profit at completionFor every open job, from the WIP schedule, so fade shows up early.
  • Over/under billing by jobWhether your billing is ahead of the work or you are financing the GC.
  • Retainage outstandingMoney you’ve earned but haven’t collected, by job and by age.
  • Service vs. project gross marginWhether service calls pay their way or just fill the schedule.

The difference

Labor units against real hours, phase by phase

Your estimate is built on labor units. Your job cost should be built the same way: hours coded to underground, rough-in, trim, gear and low voltage, and compared with the units you bid. When that comparison runs every week, you see a phase going over at the midpoint instead of in the final number, and the next bid gets sharper because the units come from your own jobs.

Client results

What Our Clients Say

Running Refined before we had Scott and his team on board to help us out was almost like running blind. We had just had our biggest year, and the little ball we roll was getting too big for me to keep everything in my head — things were starting to slip a bit.

Now we can say with confidence that we know where we stand financially at almost any given time. If we have questions, it’s not hard to get them answered within a day or two.

When you don’t know for sure where you’re at financially, you tend to make poor decisions for your business. It’s not hard at all for me to justify the money we spend with SarokaFi. It’s been a life saver.

Grant Refined Concrete

I’m on my 4th year running my business. The first 2 years I did not have SarokaFi and was having serious cash flow and cash management problems.

The last 2 years Scott and his team have turned things around, and now I am starting to be profitable and cash flow is seamless. Very highly recommend.

Parker Google review

Pricing

Pay only for what you need — or bundle and save.

  • Pick only the services you need
  • Up to 15% off when you start several together
  • Sign on within 15 days: onboarding fee waived

Let’s look at your numbers

See what SarokaFi would cost in about two minutes, or book a free Profit Assessment and we’ll look at how your jobs are costed today — and be honest about whether we’re the right fit.