SarokaFi

For remodeling contractors

Know Which Kitchens, Baths and Additions Pay You

Remodeling runs on homeowner deposits, allowances, mid-project changes and whatever turns up when the drywall comes off. We track every project by type, so you can see what a kitchen, a bath or an addition really earns, and get paid for the changes your crew makes.

Client messages with the SarokaFi team about clean books and monthly reports

Sound familiar?

Built for remodeling contractors.

Kitchen and bath remodels, additions, basements, whole-house renovations and design-build remodelers

  • “I’m on the tools all day and doing the books at night.”
  • “The homeowner keeps changing selections and I’m not sure we billed for all of it.”
  • “We opened the wall, found rot and old wiring, and the job went upside down.”
  • “Deposit money from the next job is paying for the last one.”
  • “Cabinets came in three weeks late and I had a crew with nothing to do.”

Job costing, your way

What we track on every remodeling job

01

Material costs on every job

Remodeling materials come through allowances and selections, and every overage has to be caught and billed.

  • Cabinets, countertops and fixtures by project, against the allowance
  • Homeowner selections priced over or under the allowance
  • Windows, doors and special-order items with long lead times
  • Framing lumber, drywall and trim
  • Tile, flooring and finish materials, including waste
  • Restocking fees and returns on changed selections
02

True labor costs

In a small remodeling company the owner is often the lead carpenter, and that time belongs on the job.

  • Owner and lead carpenter hours on each project
  • Demo and cleanup hours separate from build-out
  • Design, measuring and selection-meeting time
  • Full labor burden on every crew hour
  • Idle crew time waiting on materials, subs or inspections
03

Hidden project costs

What’s behind the walls and on the city’s calendar can turn a good remodel into a loss.

  • Rot, old wiring, plumbing and structural surprises found in demo
  • Permits, plan fees and inspection delays
  • Dumpsters and debris haul-off
  • Dust protection and daily cleanup in an occupied home
  • Warranty and punch-list visits after final payment
04

Margins & markup — bid vs. actual

We report bid vs. actual by project type, because a kitchen and an addition shouldn’t share a markup.

  • Gross margin by project type: kitchen, bath, addition, basement
  • Estimated vs. actual on each project at completion
  • Sub costs: plumbing, electrical, HVAC, drywall, countertops
  • Design fees and what they actually recover
  • Markup on allowance overages and selections
05

Cash timing

Homeowner deposits and draw payments have to fund the job they were collected for.

  • Deposits held for each project, following your state’s rules on deposits
  • Draw schedule tied to milestones the homeowner can see
  • Payments due to subs and suppliers, by project
  • Final payments and punch-list holdbacks
  • Separate tracking so one job’s deposit doesn’t pay for another
06

Change orders & scope creep

In remodeling, change orders are constant, and the ones agreed on in the kitchen are the ones that never get billed.

  • Homeowner changes priced and signed before the work starts
  • Concealed-condition change orders for what’s found behind walls
  • Selection upgrades and allowance overages billed as they happen
  • Schedule impacts from late decisions
  • Change order revenue as a share of the original contract

Know your target

What margin should remodeling contractors aim for?

Remodeling jobs are small, custom and labor-heavy, and the overhead per dollar of revenue — design, selling, project management, callbacks — is much higher than for builders. Remodelers need a higher gross margin just to reach a similar net.

A 30% gross margin means pricing at about a 43% markup over your job costs, not 30%. Check a job →

Typical gross margin

Remodeling30–40%

Net profit after overhead: 5–10% (before income tax)

Industry survey data

Gross margin = revenue minus direct job costs (materials, field labor with burden, subs, job equipment). How you classify labor and equipment can move it by several points — your own job costs are the number that counts.

Your monthly numbers

What you’ll see every month

  • Gross margin by project typeShows whether kitchens, baths or additions are carrying the business.
  • Change order revenue as % of contractIf changes happen on every job but this number stays low, work is going unbilled.
  • Allowance variance by projectCatches selection overages before final billing instead of after.
  • Deposits held vs. work completedMakes sure deposit money is funding the job it was collected for.
  • Owner hours on the toolsSo your own labor is priced into the bid instead of given away.

The difference

Cost by project type, and bill the changes as they happen

A kitchen, a bath and an addition carry different labor, subs and surprises, so one blended markup will overprice some and lose money on others. When every project is costed by type, with allowances, selections and concealed conditions tracked as change orders, you see what each kind of job really earns and you get paid for the work the homeowner asked for mid-project.

Client results

What Our Clients Say

Running Refined before we had Scott and his team on board to help us out was almost like running blind. We had just had our biggest year, and the little ball we roll was getting too big for me to keep everything in my head — things were starting to slip a bit.

Now we can say with confidence that we know where we stand financially at almost any given time. If we have questions, it’s not hard to get them answered within a day or two.

When you don’t know for sure where you’re at financially, you tend to make poor decisions for your business. It’s not hard at all for me to justify the money we spend with SarokaFi. It’s been a life saver.

Grant Refined Concrete

I’m on my 4th year running my business. The first 2 years I did not have SarokaFi and was having serious cash flow and cash management problems.

The last 2 years Scott and his team have turned things around, and now I am starting to be profitable and cash flow is seamless. Very highly recommend.

Parker Google review

Pricing

Pay only for what you need — or bundle and save.

  • Pick only the services you need
  • Up to 15% off when you start several together
  • Sign on within 15 days: onboarding fee waived

Let’s look at your numbers

See what SarokaFi would cost in about two minutes, or book a free Profit Assessment and we’ll look at how your jobs are costed today — and be honest about whether we’re the right fit.