Material costs on every job
Remodeling materials come through allowances and selections, and every overage has to be caught and billed.
- Cabinets, countertops and fixtures by project, against the allowance
- Homeowner selections priced over or under the allowance
- Windows, doors and special-order items with long lead times
- Framing lumber, drywall and trim
- Tile, flooring and finish materials, including waste
- Restocking fees and returns on changed selections