Landscaping Business Profit Margins: Maintenance vs. Install
Gross and net margins a landscaping business should aim for, why maintenance and installs earn differently, and how route density and drive time move them.
Commonly cited estimating targets put landscape maintenance at about 35–50% gross margin and installation and design-build at about 25–40%, with net margin before taxes around 8–15%. There’s no published industry survey behind those ranges, so treat them as targets to test against your own numbers. The two kinds of work earn money in different ways: maintenance lives or dies on crew hours and drive time, and installs on materials, subs and how well you bid.
What do gross and net margin mean for a landscaper?
Gross margin is what a property or job earns over its direct costs, divided by its price. Net margin is what the whole company keeps after overhead too.
- Direct costs are crew labor with burden, materials (mulch, rock, plants, pavers, sod, irrigation parts), subs, and equipment, fuel and dump fees used on the work.
- Overhead is the office, sales and estimating, yard and shop, insurance, vehicles not tied to a crew, and your own pay.
The oldest widely quoted trade-press targets come from Lawn & Landscape, which published gross margin targets in 2015 of 35% for maintenance, 35% for residential installation and 25% for commercial installation, each plus or minus 5%. For a sense of scale at the very top of the industry, BrightView, the largest US commercial landscaper, reported about a 13% adjusted EBITDA margin for fiscal 2025. That’s EBITDA, not net, and it’s one very large company, so read it as context, not a target.
Why maintenance and installs earn differently
Maintenance and installs sit in different parts of the range because their costs are built differently.
Maintenance is mostly labor and equipment, with little material. Once the contract price is set, margin depends on how many hours each property really takes and how much paid time the crew spends driving between them. Route density, meaning how close together your properties are, is the biggest lever you have.
Installation and design-build carry much more material and sub cost: plants, stone, base, irrigation, sometimes electrical or excavation subs. They’re often bid, especially commercial work, so they sit lower in the range. Residential design-build sold on value tends to sit higher than commercial installs bid against other landscapers.
That’s why our page for landscaping contractors reports maintenance, installs and hardscape as separate divisions.
A worked example: one company, two divisions
Say a landscaping company does $1,200,000 a year: $700,000 in maintenance and $500,000 in installation. These are round example numbers, not a real company.
| Maintenance | Installation | Company | |
|---|---|---|---|
| Revenue | $700,000 | $500,000 | $1,200,000 |
| Crew labor with burden | $280,000 | $100,000 | $380,000 |
| Materials | $35,000 | $175,000 | $210,000 |
| Subs | — | $50,000 | $50,000 |
| Equipment, fuel, dump fees, rentals | $70,000 | $15,000 | $85,000 |
| Gross profit | $315,000 | $160,000 | $475,000 |
| Gross margin | 45% | 32% | 39.6% |
Overhead, including the owner’s pay, is $350,000. That leaves $125,000 of net profit before taxes, or about 10.4% of revenue.
Both divisions are inside their target ranges, and the company blend looks healthy. But look at what the blend hides. If maintenance slipped to 38% because of a few bad properties, the company would still show about 35.5% gross and you might not notice until net profit fell. Separate numbers show the problem while you can still fix next year’s contracts.
How drive time eats maintenance margin
Drive time is paid crew time no customer pays for, so it belongs in the cost of the properties on that route.
Say a three-person crew costs $90 an hour fully burdened, and a property is priced on one crew-hour on site. If the crew spends 20 minutes driving to it from the last stop, the property really takes 1 hour 20 minutes, a third more than priced. That’s an extra $30 of cost on every visit. Over 30 visits a season, it’s $900 on one property, and a route of 15 properties like it is $13,500.
Tightening routes, pricing scattered properties higher or dropping the ones that don’t fit are all ways to win that back. The labor burden calculator gives you the real hourly cost to run this math with your own crews.
How to raise margin in each division
The levers are different for each kind of work, which is one more reason to keep the numbers apart.
Maintenance: tighten routes, re-price properties that take more hours than the contract covers, and add enhancement work, like seasonal color, mulch refreshes and extra cleanups, priced on its own rather than thrown in.
Installation and design-build: check bid vs. actual on every job, mark up plants and materials enough to cover warranty replacements, and get changes priced and signed in the yard before they go in.
Both: cost equipment by the hour, and review each division’s margin monthly, not at the end of the season.
Common mistakes
Bidding maintenance by gut. Price contracts on measured crew hours per property, including drive time, at burdened rates.
Treating maintenance as one big bucket. Install jobs get job-costed; maintenance often doesn’t. Track crew hours by property and route. The job costing guide covers how to set it up.
Leaving equipment and fuel in overhead. Mowers, trailers and skid steers do specific work. Cost them by the hour or the job.
Not tracking plant warranty replacements. Charge them back to the original install, so the nursery markup you counted on is measured against what replacements really cost.
Confusing markup and margin. A 35% margin needs about a 54% markup over direct costs. The markup vs. margin calculator shows the difference in dollars.
Spending prepaid contracts in spring. A customer who prepays the season has paid for work you haven’t done yet. The seasonal cash flow article covers keeping that money for the months it pays for.
Where this breaks down
The ranges here are commonly cited estimating targets, and the best trade-press benchmark behind them is from 2015. Landscaping sources also disagree on whether field-labor burden and equipment belong in direct costs. A company that leaves them in overhead will report a higher gross margin than one that doesn’t, with exactly the same economics.
Add-ons change the picture too. Irrigation, lawn care and snow removal often carry their own margins, and snow is weather-driven, so it can swing a year’s results on its own. The numbers that count are your own divisions, costed the same way every month, which is what job costing by property and route gives you.
Frequently asked questions
What is a good profit margin for a landscaping business?
Commonly cited estimating targets are about 35–50% gross margin on maintenance, 25–40% on installation and design-build, and 8–15% net before taxes. There's no published industry survey behind those ranges, so set your own targets from your job costs. Add-ons like irrigation, lawn care and snow often pull the blended margin up.
Is landscape maintenance more profitable than installation?
Usually by gross margin, yes, because maintenance carries little material cost. Installs can bring in more gross profit dollars per job, though, and they keep crews busy. The right mix depends on your crews, equipment and market, which is why each division needs its own numbers.
How do I know if a maintenance property is losing money?
Compare the crew hours the property actually takes, including its share of drive time, with the hours the contract was priced on. Multiply the gap by your burdened labor cost per hour. A property that takes 30% more time than you priced is losing margin every visit.
Should equipment and fuel be in job costs or overhead?
In job costs, as much as you can. Mowers, trailers, skid steers and fuel are used to do specific work. When they sit in overhead, maintenance and installs look more profitable than they are, and you can't tell which division is using the equipment.
Keep reading
- IndustryBookkeeping & Job Costing for Landscaping CompaniesAccounting for landscapers: maintenance routes, installs and hardscape costed separately, with materials, crew hours and seasonal cash tracked.
- Free toolMarkup vs. margin calculatorYour real margin on a job, from real costs.
- Free toolLabor burden calculatorWhat an hour of labor really costs you.
- GuideJob Costing for Contractors: The Complete GuideJob costing tracks every dollar of labor, materials, subs and equipment against the job that caused it. How to set it up, run it and use it to bid better.
- ArticleSeasonal Cash Flow for Contractors: How to Get Through the Slow MonthsHow contractors handle winter slowdowns: build reserves in season, manage fixed costs and crew, use credit carefully and book spring work early.